This is a 2026 step-by-step pathway guide for an Electrician (Special Class) migrating to Australia under ANZSCO 341112. 341112 is on CSOL with state nomination availability — full skilled visa stack: Subclass 189 Independent (where listed), Subclass 190 State-Nominated, Subclass 491 Regional Provisional → 191 PR, Subclass 186 Direct Entry, Subclass 494 Regional Employer → 191, and Subclass 482 Core Skills → 186 TRT.
For the cost / timeline view see the 341112 cost & timeline case study. For TRA document details see the skills assessment guide.

Step 1 — Confirm 341112 is the right code
ANZSCO 341112 covers specialty electrical work — HV (>1000V) switchgear installation and testing, substation work, transformer connections, instrumentation and control wiring (4-20mA loops, HART, Foundation Fieldbus, Profibus, Modbus), PLC field wiring (Allen-Bradley, Siemens, Schneider, Mitsubishi), VSD / drive setup and termination, motor control centre (MCC) wiring, ATEX / hazardous-area (mining, oil & gas, petrochemical) installation per AS / NZS 60079, traction power (rail electrification), renewables high-voltage tie-ins, building automation system (BAS / BMS) field wiring.
If your work is general residential / commercial LV, 341111 fits better.
Step 2 — TRA skills assessment
TRA — tradesrecognitionaustralia.gov.au. Pathways: JRP (onshore) or OSA (offshore).
Standard turnaround: OSA ~12 weeks; JRP 12-18 months.
Step 3 — English
EOI lodgement requires Competent English. For points-tested visas, target Proficient (10 pts) or Superior (20 pts).

Step 4 — Choose a visa pathway
Subclass 189 / 190 / 491
189 if 341112 is on MLTSSL — confirm at EOI. 190 / 491 are realistic.
Subclass 186 / 494 / 482
Main 341112 employers:
- Mining services / Tier 1 engineering contractors — UGL, Monadelphous, Civmec, Macmahon, RCR Tomlinson, Worley, Wood.
- Utilities — Powerlink Queensland, AusNet Services, Transgrid, ElectraNet, TasNetworks, Western Power, Ausgrid, Endeavour, Essential.
- Renewables EPCs — Acciona Energia, Beon Energy Solutions, RES Australia, Goldwind Australia, Vestas Australia, Siemens Energy, GE Vernova.
- Mining majors — BHP, Rio Tinto, Fortescue, Newmont, Northern Star, South32, IGO — in-house HV / industrial electricians.
- Oil & gas / petrochemical — Woodside, Chevron, INPEX, Santos, Origin, Shell — including Pluto / Gorgon / Wheatstone / Ichthys plants.
- Rail traction power — Sydney Trains, Metro Trains Melbourne, Queensland Rail traction crews; rail contractors (CPB, John Holland Rail, Laing O'Rourke Rail).
- Defence — BAE Systems, Boeing Defence, Thales, Saab, Lockheed Martin — for naval / aerospace HV electrical.
- Data centre power infrastructure — AirTrunk, NEXTDC, Equinix MV / HV electricians.
Step 5 — Score / Step 6 — Submit
Use points calculator. Lodge via SkillSelect.

Tools
Authoritative sources
Next step
Want to map your special class electrician profile against 189 vs 190 vs 491 vs 186 vs 494 vs 482? Book a 30-minute free strategy call.

